Position:home>Technical information>Those who purify workshop is clean degree of management and energy-saving move
Those who purify workshop is clean degree of management and energy-saving move
From;  Author:Stand originally
As the supply exceeds demand of the flying development of industry of our country electron and product, the competition of each product is intense with each passing day, making the key that wins this competition is the quality of the product and price: Clean degree of premise condition that is electronic product production, and the foundation that low cost is product value. We introduce to be in below the experience of a few management of this respect, consult in order to offer everybody. 1 clean the air conditioning that spends the manufacturing workshop requirement that runs us is clean degree for 3000(imperial, similarly hereinafter) reach 5000 level, when installation manufacturer is debugged, all press set juice data actually to decide, be like: Efficient filter exports the wind speed that controls for Lm/s; Answer the wind speed that blast tuyere controls for 2m/s, at first put into production is reached in when batch is produced, clean degree can achieve a requirement. After debugging manufacturer to withdraw, as the addition of crop, clean degree gradually short of requirement, of together with equipment transform upgrade, the clean when actual output designs crop more than spends a question completely more outstanding, the part is versed in clean degree fall even 1 million class; And large area is clean all round this area degree exceed bid, because the company worries about problem of occurrence product quality for a time stop production, foreign the expert has all sorts of speculation to exceeding symptom cause, did not find a reason from beginning to end. 2 energy-saving moving government run cost to reduce, the air conditioning carry of my company adopted the following method all right: (The temperature of 1) refrigerant water, pressure follows seasonal change and change; When the summer because atmospheric temperature and humidity is high, before air sends production the spot, need drops in temperature dehumidify (humidity of the air outdoor often amounts to) of 85 % above, at this moment we are in refrigerant water lukewarm control 7 ℃ of 6 ~ , pressure 5-5.5kg/cm2, if winter is refrigerant the temperature of water or above, pressure, so the refrigerant water valve of air conditioning opens very small very difficult also control, cause refrigerant water finally, heat, add wet valve 3 are opened, create the enormous waste of the sources of energy. (Of 2) each working procedure press difference to press water column of floor level 0.5mm (5Pa) control, air conditioning of double electric machinery opens only as far as possible. Air conditioning designs the important working procedure of my company to move for double fan, the referenced value of the times of air replacement of the design is the average of course of study of person of the same trade. (3) grows according to Shenzhen summer, the characteristic with short winter, the temperature and humidity wet air conditioning of constant temperature constant is fiducial and proper on tone () is moved on hot enthalpy namely, with managing cold quantity and quantity of heat. (4) is other and energy-saving measure: In the summer to reduce refrigerant water drop in temperature dehumidify bear, we are not affecting air conditioning to control the premise of limits to fall, open the summer refrigerant water dehumidify all the time, heat the air conditioning set point that warm up is appropriate on tone, summertime new wind force and platoon wind force leave the smallest; Next will new wind force and platoon wind force open the case that winter permits in air conditioning the biggest. Comfortable sex air conditioning is installed lukewarm accuse implement, environmental temperature real control is in 28 ℃ of 26 ~ , in order to achieve the goal with energy-saving utmost.

Previous12 Next